The wall is often constructed with the use of concrete and steel and works with the foundational slab to create a solid basis for the building.
Stem wall concrete slab foundation.
Then the fill dirt is added and compacted.
Stem wall slabs are constructed in a multi part process where a footer is poured at virgin ground level then blocks are laid forming a wall up to the finished slab elevation.
Finally a slab is poured to the desired level.
The stem wall on a concrete foundation is essentially the supporting wall that joins the foundation of a building to the vertical walls of the structure that is constructed atop the foundation.
This process takes a bit longer than the monolithic slab but a more stable foundation will prevent other issues down the road that could arise with trusses or wall construction.
The stem wall transmits the load of the structure to the footing which distributes the structure weight over a wider area.
With a stem wall foundation the concrete is poured in multiple stages.
Stem walls are supporting structures that are used as a means of joining the foundation of a building with the vertical walls constructed on the foundation.
There are several stages to the construction of a stem wall which begins with cinder blocks that are reinforced with steel rods and concrete.
The first of these is to build a stem wall of concrete blocks up to the desired slab level.
A trench is excavated around the foundation for the construction of the stem wall.